Deployment Guide

2. Breakout port successfully configured; success/failure tooltip notification message displays.
3. Select the number of ports to view by page.
Add jump port
1. Select the switch to view the Leaf switch properties and the current jump port, then click Jump Port.
2. Enter the Name of the new jump port, select the Interface Name, select the Untagged Network, then click Add.
3. Jump ports add success; success/failure tooltip notification message displays.
Delete jump port
1. Select the switch to view the leaf switch properties to remove.
42
OMNI SmartFabric management