Install Guide

Table 2. Edge 3000 Series LED behavior (continued)
LED Description
10 GbE SFP+ port LEDsSFP3 and SFP4
OffNo link
Solid greenLink operating at maximum speed, 10G
Solid yellowLink operating at a lower speed, 1G
Flashing greenport activity for 10G
Flashing yellowport activity for 1G
Table 3. BMC and CPU Console and management Ethernet port LEDs
LED Description
Link LED
OffNo link
Solid greenLink operating at a maximum speed,
autonegotiated/forced or 1G
Solid yellowLink operating at a lower speed,
autonegotiated/forced or 10/100M
Activity LED
OffNo link
Flashing greenPort activity
Prerequisites
For installation instructions, see Site preparations and Edge 3000 Series installation.
The following is a list of components need to install the Edge 3000 Series platform:
Dell EMC SD-WAN Edge 3400 or 3800 platform
AC country- and regional-specific cables
Two-post rail kit mounting brackets for rack installation, included
Screws for rack installation
#1 and #2 Phillips screwdrivers, not included
M2 Philips drive flat head screwdriver, not included
Ground cable screws for L-bracketorder separately
M3 ground lug assembly kit screw
Copper/fiber cables
Other optional components are:
Expansion card
UL-certified ground lug assembly kit with bracket
Extra mounting brackets for the four-post mount
Luggage tag
The Edge 3000 Series has a pull-out tag, known as a luggage tag, on the I/O-side of the platform. The front of the luggage tag
includes platform ID information.
Edge 3000 Series
11