Install Guide
As the system functions are in process, the service indicator displays:
● White—initial power-on and boot is in progress.
● Flashing blue—system reset or software update is in progress.
● Flashing white—VeloCloud Orchestrator function in progress.
The Edge 510 LTE also includes RJ45 port status LED displays on the back of the platform.
The RJ45 port status LEDs are located to the left and right of each port.
Table 1. RJ45 port status indicator LEDs
LEDs Status Link and speed
Left side-activity
(green)
Solid green No activity
Blinking green Activity
Right side-link status
(bicolor green or
amber)
Solid green Link up, 1 Gbps
Solid amber Link up, 10 Mbps or 100 Mbps
Off Link down
Edge 510 LTE configuration
● Two-core CPU
● Four 1 GbE networking ports
● One Mini USB 2.0 console port
● Two USB 2.0 Type-A
● AC power supply
● No fan
● Airflow on sides and back
Prerequisites
The following is a list of components that are required for successful platform installation:
NOTE: For detailed installation instructions, see Site preparations and Site installation.
● Dell EMC Edge 510 LTE platform
● AC country- and regional-specific cable to connect the AC power source to each of the AC power supplies
● Wall mount brackets and accessories for mounting on wall.
● Rubber feet for desktop use
● (Optional) rail mounting accessories for rack mount
● (Optional) screws for rack installation (not included)
● Number 1 and number 2 Phillips screw drivers (not included).
● Torx screwdriver (not included)
● RJ-45 Ethernet cable
● Mini-USB console cable (not included).
8
Edge 510 LTE