White Papers

Version 1.0.0 13
Completed with Errors
Job has been completed with one or more errors.
Failed
Job has been Failed
Job Type = “BIOS Configuration”
New
New Job has been created
Ready For Execution
Job is ready for execution
Scheduled
Job has been scheduled
Completed
Job has been completed.
Completed with Errors
Job has been completed with one or more errors.
Failed
Job has been failed
7.2.3 StartTimeInterval
The time interval after midnight of the month to start processing the job. If no scheduled start time is
defined, the value shall be NULL.
7.2.4 UntilTime
The time interval after a job has started that it is permitted to run. If the job has not run when the time
interval has passed, the job is to be canceled. Canceling a job will cause the schedule start time
properties to be set to NULL and the JobStatus to be set to Failed.
7.2.5 Message
If an error occurs during the processing of a job, more detailed error information is provided for
subsequent inspection of the job completion status. The Message property of the job contains the error
message describing the job failure detail.
7.2.6 MessageID
An identifier for the error message that can be used to index into Dell Lifecycle Controller Message
Registry xml files. The Message Registry files are available in localized versions for English, French,
Spanish, German, Japanese and Chinese. They also contain more detailed descriptions of the error
condition and recommended response actions.
7.2.7 MessageArguments
An error message may contain substitution variables that are filled in dynamically at runtime. To support
localizing versions of the message, the values of the substitution variables are set in the
MessageArguments array in the order they are defined in the Message Registry.