Owners Manual

Dell Integrated Systems for Oracle Database 2.0 - Owner’s Guide 1.1
44
Figure 19 shows the SAN infrastructure cabling diagram of a 2×2 R930-based FC DISOD
solution.
Figure 19 Cabling diagram SAN infrastructure 2×2 R930-based FC DISOD solution
1
2
7
2
1
3
6
4
5
1 2 3 4
iDRAC
750W750W
8 4 2
PORT 2
8 4 2
PORT 1
8 4 2
PORT 2
8 4 2
PORT 1
1
2
7
2
1
3
6
4
5
1 2 3 4
iDRAC
750W750W
8 4 2
PORT 2
8 4 2
PORT 1
8 4 2
PORT 2
8 4 2
PORT 1
47
43
46
42
45
41
44
40
39
35
38
34
37
33
36
32
31
27
30
26
29
25
28
24
23
19
22
18
21
17
20
16
15
11
14
10
13
9
12
8
7
3
6
2
5
1
4
0
Brocade 6510
47
43
46
42
45
41
44
40
39
35
38
34
37
33
36
32
31
27
30
26
29
25
28
24
23
19
22
18
21
17
20
16
15
11
14
10
13
9
12
8
7
3
6
2
5
1
4
0
Brocade 6510
DAAD-#2 (U13-14)
DAAD-#1 (U15-16)
HA Pair
R930-DB-#1 (U19-22)
R930-DB-#2 (U24-27)
Brocade 6510-#1 (U18)
Brocade 6510-#2 (U17)
FC - DB-#1 (U19-22)
FC - DB-#2 (U24-27)
FC - DAAD-#1 (U15-16)
FC - DAAD-#2 (U13-14)
12
34
iDRAC
2/10
1/9 1/1
2/2
1100W
1100W
1100W
1100W
8 4 2
PORT 2
8 4 2
PORT 1
PCIe x8 8Gb FC
8 4 2
PORT 2
8 4 2
PORT 1
PCIe x8 8Gb FC
12
34
iDRAC
2/10
1/9 1/1
2/2
1100W
1100W
1100W
1100W
8 4 2
PORT 2
8 4 2
PORT 1
PCIe x8 8Gb FC
8 4 2
PORT 2
8 4 2
PORT 1
PCIe x8 8Gb FC
S = Slot
P = Port
DB #1
DB #2
S5P2
S4P2
Port 16
S5P2
S4P2
Port 17
Port 20
Port 21
6510-U18
S5P1
S4P1
Port 16
S5P1
S4P1
Port 17
Port 20
Port 21
6510-U17
Slot 5
Slot 4
T = Top
S = Switch
B = Bottom
P = Port
TSTP
BSTP
Port 2
Port 1
TSBP
BSBP
Port 2
Port 1