Setup Guide

You must congure the interface proxy gateway LLDP to enable or disable a proxy-gateway LLDP TLV on specic interfaces.
The interface is typically a VLT port-channel that connects to a remote VLT domain.
The new proxy gateway TLV is carried on the physical links under the port channel only.
You must have at least one link connection to each unit of the VLT domain.
Following are the prerequisites for Proxy Gateway LLDP conguration:
You must globally enable LLDP.
You cannot have interface–level LLDP disable commands on the interfaces congured for proxy gateway and you must enable both
transmission and reception.
You must connect both units of the remote VLT domain by the port channel member.
If you connect more than one port to a unit of the remote VLT domain, the connection must be completed by the time you enable the
proxy gateway LLDP.
You cannot have other conicting congurations (for example, you cannot have a static proxy gateway conguration).
Proxy Gateway LLDP conguration might not operate properly if one of the following conditions is true:
Any proxy gateway conguration or LLDP conguration is not working.
LLDP packets fail to reach the remote VLT domain devices (for example, because the system is down, rebooting, or the port’s physical
link connection is down).
VLT Proxy Gateway 1063