Specifications

Installation 13
4
Installation
Unpacking the Switch
This section describes the package contents and the steps to unpack the S6000
switch.
Package Contents
When unpacking each switch, make sure that the following items are included:
One S6000 switch
One RJ-45 to DB-9 female cable
Two sets of rail kits (no tools required)
Two PSUs
One AC power cord (country/region specific)
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement
Unpacking Steps
NOTE: Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
Step Task
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean
surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.