Install Guide
Figure 5. rNDC front panel LED call-outs
Table 4. Expansion card LEDs
LED Description
rNDC, card system status LEDs
• Off—Card is off
• Solid green—Normal operation
• Solid yellow—Citical card error
• Flashing green—Booting
• Flashing yellow—Noncritical card error
rNDC, card temperature status LED
• Off—Card is off
• Solid green—Normal temperature operation
• Solid yellow—Temperature is at the limit
• Flashing yellow—Temperature is over the limit
Pre-requisites
NOTE: For detailed installation instructions, see Site preparations and VEP4600 installation.
The following is a list of components required for successful platform installation:
• VEP4600 platform
• AC country- and regional-specific cables to connect the AC power source to each of the platforms’ AC power supplies
• Two-post rail kit mounting brackets for rack installation, included
• Screws for rack installation
• #1 and #2 Phillips screwdrivers, not included
• M2 Philips drive flat head screwdriver, not included
• Ground cable screws (included) for L-bracket—order separately
• M3 ground lug assembly kit screw, depending on your platform
• Copper/fiber cables
Other optional components are:
• UL-certified ground lug assembly kit with bracket
• Extra mounting brackets for the 4-post mount
• Extra power supply unit
• Extra fan module
VEP4600 platform
11