Install Guide

NOTE: The illustrations in this document are not intended to represent a specific platform.
NOTE: Do not the use the mounted two-post rails as a shelf or a workplace.
Rack mount safety considerations
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing
personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the
rack, then work to the top. Do not exceed your rack’s load rating.
Power considerations—Connect only to the power source specified on the unit. When you install multiple electrical components in a
rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension
cords present fire and shock hazards.
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than the room ambient temperature. Use care not to exceed the 45°C maximum ambient temperature of the platform.
Reduced air flow—Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not
compromised.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other
than the direct connections to the branch circuit, for example, use of power strips.
Do not mount the equipment with the back panel facing downward.
Two-post installation
To easily configure your rack for installation of the VEP4600, use the two-post rack mounting system provided. To complete this
installation, supply four rack-mounting screws.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
Figure 8. Two-post rail
1U mid-rack installation
1. Attach the inner platform rails to the VEP4600.
Line up the half-holes on the rail with the mounting heads on the platform and attach the rail to the platform. Slide the rail back until it
locks into place.
18
VEP4600 installation