Install Guide

Figure 14. Platform flush-mounted on two posts
Four-post installation
To complete this installation, supply eight rack-mounting screws.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Separate each rail assembly by sliding the inside rail out of the outside rail.
2. Attach the inner platform rails to the VEP4600.
Line up the half-holes on the rail with the mounting heads on the platform and attach the rail to the platform. Slide the rail back until it
locks into place.
Figure 15. Platform rail attachment
3. Repeat on the other side of the platform.
4. Attach the platform rails to the four-post rack rails using two user-supplied screws on each side.
VEP4600 installation
21