Setup Guide

Figure 4. Platfrom rail attachment
2. Repeat on the other side of the platform.
3. Attach the outer platform rails to the two-post rack rails using two user-supplied screws on each side.
4. After you install both rails, line up the platform rails with the installed rack rails. Slide the platform in until it is flush with the front of
rack.
About three inches before you fully insert your platform, the rail locking feature engages to keep the platform from inadvertently sliding
out and falling.
Figure 5. Platform two-post installed
NOTE:
Do not the use the mounted rails as a shelf or a workplace.
To remove the platform, unscrew the rack-mounting screws and slide the platform forward.
Four-post installation
To complete this installation, supply eight rack mounting screws.
NOTE:
The following installation instructions are for NEBS-compliant platforms.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Separate each rail assembly by sliding the inside rail out of the outside rail.
2. Attach the inner platform rails to the VEP4600.
Line up the half-holes on the rail with the mounting heads on the platforms and attach the rail to the platform. Slide the rail back until it
locks into place.
10
VEP4600 installation