Setup Guide

VEP4600 installation
To install VEP4600, complete the installation procedures in the order presented in this section.
Always handle the platform and its components with care. Avoid dropping the platform or any field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the platform and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this platform.
Topics:
Unpack
VEP Expansion Card installation
Ground cable
Rack or cabinet installation
Two-post installation
Four-post installation
Optics installation
Platform power-up
Unpack
NOTE:
Before unpacking the platform, inspect the container and immediately report any evidence of damage.
When unpacking VEP4600, make sure that the following items are included:
One VEP4600
One or two AC PSUs, depending on the configuration
Four or five AC normal fan units, depending on the configuration
One RJ-45 to DB-9 female cable
Two-post rail kit, no tools required
One or two country- and region-specific AC power cords, depending on the configuration
Ground lug kit (included in the accessories box)
VEP4600 Setup Guide
Safety and Regulatory Information
Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container.
3. Carefully remove the platform from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
VEP Expansion Card installation
NOTE:
Customers are not to attempt installing Virtual Edge Platform (VEP) 4600 expansion cards. A Dell EMC Certified
technician must perform this installation.
CAUTION: The expansion cards are intended for professional installation only.
3
VEP4600 installation 7