Users Guide

LCD messages
If the LCD panel is available, it displays the following messages in a sequence:
1. Importing When the server configuration profile is being copied from the USB device.
2. Applying When the job is in-progress.
3. Completed When the job has completed successfully.
4. Completed with errors When the job has completed with errors.
5. Failed When the job has failed.
For more details, see the results file on the USB device.
LED blinking behavior
The USB LED indicates the status of a server-configuration profile operation being performed using the USB port. The LED may
not be available on all systems.
Solid green The server configuration profile is being copied from the USB device.
Blinking green The job is in progress.
Blinking amber The job has failed or completed with errors.
Solid green The job has completed successfully.
NOTE: On PowerEdge R840 and R940xa, if there is a LCD present, the USB LED does not blink when an import operation
is in progress using the USB port. Check the status of the operation using the LCD.
Logs and results file
The following information is logged for the import operation:
Automatic import from USB is logged in the Lifecycle Controller log file.
If the USB device is left inserted, the job results are recorded in the Results file located in the USB key.
A Result file named Results.xml is updated or created in the subdirectory with the following information:
Service tag Data is recorded after the import operation has either returned a job ID or returned an error.
Job ID Data is recorded after the import operation has returned a job ID.
Start Date and Time of Job - Data is recorded after the import operation has returned a job ID.
Status Data is recorded when the import operation returns an error or when the job results are available.
298
Using USB port for server management