Installation guide
Table Of Contents
- Contents
- About This Document
- Product Overview
- Installing the PowerConnect B-FCX Switch
- Unpacking the device
- Installation tasks
- Installation precautions
- Preparing the installation site
- Powering on the system
- Attaching a PC or terminal
- Installing and replacing a power supply unit
- Installing or replacing fan trays on PowerConnect B-FCX624s and PowerConnect B-FCX648s devices
- Installing or replacing fan trays on PowerConnect B-FCX624 and PowerConnect B-FCX648 devices
- Installing an optional module on PowerConnect B-FCX624s or PowerConnect B-FCX648s devices
- Installing an optional module in PowerConnect B-FCX624 and PowerConnect B-FCX648 devices
- Checking Network Devices and Testing Connectivity
- Managing the PowerConnect B-FCX Hardware
- Hardware Specifications
- Troubleshooting
- Regulatory Statements
- Cautions and Danger Notices

PowerConnect B-FCX Switch Hardware Installation Guide 69
53-1002267-01
Regulatory compliance
A
English translation of above statement
Certificate of Conformity in "Certification System in the field of telecommunications" #
ОС-2-СПД-0560, validity from the 29 of October 2009 to the 29 of October 2012.
Regulatory compliance
Table 27 lists the Electromagnetic Compatibility (EMC), Immunity standards, and safety agency
approvals for the PowerConnect B-FCX family of switches.
.
TABLE 27 Regulatory Compliance and Safety Approvals
Certifications
Emissions:
• ICES-003, Electromagnetic Emission
• FCC Part 15 Class A
• EN 55022/CISPR 22 Class A
• VCCI Class A
• EN 61000-3-2, Power Line Harmonics
• EN 61000-3-3, Voltage Fluctuation & Flicker
• EN 61000-6-3, Electromagnetic Compatibility, Generic Standard
• AS or NZS CISPR 22, Electromagnetic Compatibility
Immunity:
• EN 61000-6-1, Electromagnetic Compatibility, Generic Standard
• EN 55024, Information Technology equipment - Immunity
Characteristics
Safety:
• BI-NAT-CSA 60950-1-07/UL 60950-1-07
• EN 60950-1:2006 +A11:2009
• IEC 60950-1:2005