Installation Manual

90 BigIron RX Installation Guide
53-1001811-01
mRJ-21 procedures
3
mRJ-21 procedures
The following procedure demonstrates securing up to eight RJ-21 cables into the Cable CInch.
When securing fewer than the maximum cables, follow the procedure to secure the desired
number of cables and simply wrap the remaining Velcro strap around the Cable CInch. Use the
additional slots in the clip to secure groups of cables as required.
Cable Cinch with two mRJ-21 cables
To secure two mRJ-21 cables, place the Velcro strap through slot one and use the front and rear left
recesses as shown in Figure 57.
FIGURE 57 Two mRJ-21 cables