Users Guide
Table Of Contents
- Getting Started With Your System
- Notes, Cautions, and Warnings
- Regulatory Model B08S
- Installation and Configuration
- Installing the Tool-Less Rail Solution
- Optional—Connecting the Keyboard, Mouse, and Monitor
- Connecting the Power Cable(s)
- Turning on the System
- Complete the Operating System Setup
- Other Information You May Need
- Technical Specifications
- 系统使用入门
- Mengaktifkan Sistem Anda
- はじめに
- 시스템 시작하기
Getting Started With Your System | 6
4
On each vertical rack flange on the back, put two screw bases into the
two square holes right above the rail. See Figure 3.
5
Install the chassis stabilizer shipping brackets (optional) on the back
rack flanges.
6
Install and tighten the screws.
NOTE:
To transport systems already installed in the rack, ensure that the two
chassis stabilizer shipping brackets (optional) are in place.
Figure 3. Installing the Chassis Stabilizer Shipping Brackets