Owners Manual

Table Of Contents
Figure 73. Installing the system board
a. system board
Next steps
1. Install the following:
a. internal USB key
b. SD vFlash card
c. IDSDM card orrSPI card
d. NDC
e. PCIe mezzanine cards
f. expander card
g. storage controller card
h. hard-drive cage or SSD cage
i. hard-drive backplane or SSD backplane
j. hard drives or SSDs
NOTE: Ensure that you reinstall the hard drives or SSDs in their original locations.
k. cooling shroud
l. memory modules
m. processor(s) and heat sink(s)
2. Remove the plastic I/O connector covers from the back of the system.
3. Follow the procedure listed in the After working inside your system section.
134
Installing and removing sled components