Owners Manual
Figure 32. Installing the Network Daughter Card
1.
slot on the NDC 2. screw (2)
3. NDC 4. standoff (2)
5. connector 6. tab projections
Next steps
1. Install the mezzanine card.
2. Follow the procedure listed in the After working inside your system section.
Related references
Safety instructions on page 52
Related tasks
Removing the mezzanine card on page 70
Removing the Network Daughter Card on page 82
Installing the mezzanine card on page 71
After working inside your system on page 53
Processors
Your system supports one or two Intel Xeon E5-2600 v3 or E5-2600 v4 product family processors.
CAUTION: For processors of 105 W, 120 W, or 135 W, use heat sinks of 68 mm width.
CAUTION: For processors of 135 W (four cores, six cores, or eight cores) or 145 W, use heat sinks of 86 mm
width.
NOTE: Mixing processors of different wattages is not supported.
Use the following procedure when:
Installing and removing blade components
85