Users Guide

5 Select the necessary Switch Ports and select any Tagged Networks or Untagged Networks.
To congure new network other than the existing ones, click Add Network and enter the network details. For more details see, Adding
Network.
NOTE: You cannot edit the ports or networks when uplinks are in FCoE, FC Gateway, or FC Direct Attach modes.
Viewing topology details
The fabric topology image displays only the operational status of the ports. If the operational status is "up", a check mark is displayed. To
view the graphical representation of the validation errors in an MCM scenario, go to the
Group Topology page on the OME–Modular web
interface.
To view topology details:
From the Devices drop-down, select Fabric.
From the fabrics table, select the fabric and click View Details.
From the Fabric Details page, click Topology.
The topology of the fabric is displayed.
Editing fabric details
To edit the fabric details:
1 From the Devices drop down, select Fabric.
The Fabric page is displayed.
2 From the fabrics table, select the fabric and click Edit.
The Edit Fabric page is displayed.
3 Make the necessary changes to the Name and Description elds.
Deleting uplinks
To delete an uplink:
1 From the Devices drop down, select Fabric.
The Fabric page is displayed.
2 In the fabrics table, select any fabric and click View Details.
3 In the uplinks table, select the uplink to be deleted.
4 Click Delete. Click Yes to conrm the deletion.
Deleting fabric
To delete an existing fabric:
1 From the Devices drop-down, select Fabric.
The Fabric page is displayed.
2 From the fabrics table, select the fabric that you want to delete.
3 Click Delete.
A message is displayed prompting you to conrm the deletion.
4 Click Yes to proceed.
72
SmartFabric Services