Users Guide
10 Dell EMC PowerEdge MX SmartFabric Configuration Guide with Cisco ACI
2 Process flow and checklist
This guide is used with other documentation to configure the validated MX networking SmartFabric and Cisco
ACI environment that is shown in Figure 4 on page 15.
Table 1 shows the ordered steps and locations that are referenced in the duration of this guide. Each step is
covered in detail either in this guide or a link that is referenced in Table 1. The table may also be used as a
checklist to ensure full coverage of all instructions in the guide.
Note: While some steps can be performed in a different order than shown in the table, this guide was
validated using the order mentioned in Table 1.
Step reference table and checklist
☒
Step
Description
Reference
Where to
implement
☐
1
Physically cable the MX Chassis and
upstream switches
Dell EMC PowerEdge MX SmartFabric
Configuration and Troubleshooting
Guide, section 3.2
Hardware
☐
2
Create multi-chassis management
group
This document. section 3.1.2
OME-M
☐
3
Deploy APIC and register Nexus leaf
and spine switches
Fabric Initialization and switch discovery
Cisco document
APIC
☐
4
Create VLAN Pool
This document, section 4.2, step 4.2.1
APIC
☐
5
Create a Physical Domain
This document, section 4.2, step 4.2.2
APIC
☐
6
Create an Attachable Access Entity
Profile
This document, section 4.2, step 4.2.3
APIC
☐
7
Create a Port Channel Policy
This document, section 4.2, step 4.2.4
APIC
☐
8
Create a vPC Interface Policy Group
This document, section 4.2, step 4.2.5
APIC
☐
9
Create a Leaf Access Port Policy
Group
This document, section 4.2, step 4.2.6
APIC
☐
10
Create a Leaf Interface Profile
This document, section 4.2, step 4.2.7
APIC
☐
11
Create a vPC Domain Policy
This document, section 4.2, step 4.2.8
APIC
☐
12
Create a vPC Explicit Protection Group
This document, section 4.2, step 4.2.9
APIC
☐
13
Create a Leaf Profile
This document, section 4.2, step 4.2.10
APIC
☐
14
Create a Tenant
This document, section 4.2, step 4.2.11
APIC
☐
15
Create a VRF
This document, section 4.2, step 4.2.12
APIC
☐
16
Create Bridge Domains
This document, section 4.2, step 4.2.13
APIC
☐
17
Create an Application Profile
This document, section 4.2, step 4.2.14
APIC
☐
18
Create Application EPGs
This document, section 4.2, step 4.2.15
APIC