Setup Guide

Rev. A05
March 2021
Dell EMC PowerStore Software Upgrade Guide
This document describes how to upgrade the software on your PowerStore cluster.
Topics:
Upgrading PowerStore T model clusters
Upgrading PowerStore X model appliances
Additional Resources
Performing a software upgrade on a PowerStore cluster does not stop I/O. The nondisruptive upgrade process uses redundant
paths, ensuring that no more than one node is taken offline at any given time. A single PowerStore appliance node can satisfy
I/O requirements. However, you cannot perform configuration changes or management operations on the PowerStore system
while the upgrade is in progress.
Similarly, when the PowerStore OS is upgraded and the PowerStore VASA provider is offline, the I/O and availability of the
vVol-based VMs served from the PowerStore cluster are not impacted. However, management operations such as creating
VMs, rebooting VMs, migrating VMs to other ESXi hosts, and taking VM snapshots cannot be performed on vVol-based VMs
while the VASA provider is offline.
When the PowerStore OS upgrade is complete, wait five to ten minutes for the status of the PowerStore VASA provider to
change to Online in vCenter Server before creating storage containers or performing management operations on vVol-based
VMs.
NOTE:
Within this document, PowerStore software is the software upgrade package for a PowerStore system and
PowerStore OS is the operating system that runs on the nodes of a PowerStore cluster.
Upgrading PowerStore T model clusters
For the latest features and improvements, upgrade the software on the PowerStore T model cluster to the latest available
version.
About this task
When upgrading a PowerStore T model cluster, use only Dell EMC qualified software that is downloaded from the Dell Digital
Locker. The PowerStore T model upgrade package is single file that contains firmware upgrades and the PowerStore OS
upgrade.
Steps
1. Review the upgrade considerations in Upgrade readiness for PowerStore T model clusters on page 2.
2. Download the latest PowerStore T model software upgrade package from the Dell Digital Locker as described in the
Installation and Upgrade Considerations section of the PowerStore Release Notes.
3. Perform a Health Check on the PowerStore T model cluster at least seven days before performing the upgrade.
For instructions, see Perform a PowerStore T model cluster preupgrade Health Check on page 2.
4. Perform the steps in Upgrade the PowerStore T model software on page 2.
The PowerStore T model software upgrade takes approximately one hour to one and a half hours to complete per appliance.
Results
If the software upgrade process is successful, the software on the PowerStore T model cluster is upgraded. If the software
upgrade process fails, check for and resolve all critical alerts on the cluster and retry the upgrade.
1

Summary of content (10 pages)