Setup Guide

Rev. A03
January 2021
Dell EMC PowerStore Software Upgrade Guide
This document describes how to upgrade the software on your PowerStore cluster.
Topics:
Upgrading PowerStore T model clusters
Upgrading PowerStore X model appliances
Additional Resources
Performing a software upgrade on a PowerStore cluster does not stop I/O. The nondisruptive upgrade process uses redundant
paths, ensuring that no more than one node is taken offline at any given time. Either node in your appliance can satisfy I/O
requirements. However, you cannot perform configuration and management operations on the PowerStore system while the
upgrade is in progress.
Similarly, during a PowerStore OS upgrade, the I/O and availability of the vVol-based VMs served from the PowerStore
cluster is not impacted. However, management operations on vVol-based VMs served from the PowerStore cluster cannot be
performed when the PowerStore VASA provider temporarily goes offline during the upgrade. Management operations such as
creating VMs, rebooting VMs, migrating VMs to other ESXi hosts, and taking VM snapshots cannot be performed while the
VASA provider is offline.
When the PowerStore OS upgrade is complete, wait five to ten minutes for the status of the PowerStore VASA Provider
to change to Online on the vCenter Server before creating storage containers or performing management operations on
vVol-based VMs.
NOTE:
Within this document, PowerStore software is the software upgrade package for a PowerStore system and
PowerStore OS is the operating system that runs on the nodes of a PowerStore appliance.
Upgrading PowerStore T model clusters
For the latest features and improvements, upgrade the PowerStore T model software on the PowerStore T model cluster to the
latest available version.
Perform the following steps to upgrade a PowerStore T model cluster:
1. Download the latest PowerStore T model software upgrade package from the Dell Digital Locker as described in the
Installation and Upgrade Considerations section of the PowerStore Release Notes.
2. Review the upgrade considerations in Upgrade readiness for PowerStore T model clusters on page 1.
3. Complete the steps in Upgrade the PowerStore T model software on page 2. The PowerStore T model software upgrade
takes approximately one hour to complete.
NOTE:
If the PowerStore T model software upgrade process fails, check for and resolve all critical alerts on the PowerStore
system and retry the upgrade.
Upgrade readiness for PowerStore T model clusters
Before upgrading, review the following considerations:
Download the latest version of the PowerStore Release Notes to determine which software upgrade packages are required
to perform the PowerStore upgrade.
You can upload up to ten upgrade packages on your PowerStore cluster at one time. However, after an upgrade starts, it
must be successfully completed across all appliances in the cluster before another upgrade can be performed.
As a part of the upgrade process, the node that displays PowerStore Manager fails over to the peer node. During the
failover, you are disconnected from PowerStore Manager. You can log back in to PowerStore Manager after the failover
process is complete. For PowerStore clusters with two appliances, PowerStore Manager disconnects again when the second
1

Summary of content (8 pages)