Setup Guide

Table 4. Network Setup Preparation Worksheet for Block-optimized (FC-only) deployments with no ToR
switches (blank) (continued)
Step Step details Notes
8. Record the port channel ID for the OOB management
switch.
9. Once you have completed steps above, you have the necessary information to configure the switches. Continue to
work with your network administrator to complete the Initial Configuration Worksheet now to ensure that:
Your network configuration on the switch aligns with the network configuration that will be done in PowerStore T
model.
You reserve the necessary network resources to complete deployment of PowerStore T model and the PowerStore
T model networks.
10. Determine if you will use a direct connection or a remote connection to discover your PowerStore.
Once you have successfully discovered your PowerStore, you will be guided through the Initial Configuration Wizard
to create your first PowerStore cluster.
16 Prepare to configure the OOB switch and networks for an FC-only deployment