Setup Guide
Table 28. Steps to connect to the ToR switches to the core uplinks
1 Connect port 30 of the bottom ToR switch to the core Uplink A.
2 Connect port 29 of the bottom ToR switch to the core Uplink B.
3 Connect port 29 of the top ToR switch to the core Uplink A.
4 Connect port 30 of the top ToR switch to the core Uplink B.
NOTE: Work with your network administrator to determine the uplink ports to which the ToR switches will connect.
68 Cable Dell PowerSwitch Series for deployments with ToR switches