N2200-ON Series switch installation
To install the N2200-ON Series switch, complete the installation procedures in the order that is presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the N2200-ON Series switch and components. As with all electrical devices of this type, take all the
necessary safety precautions to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet hardware installation
Ground cable
Desktop
Two-post five-inch-offset switch installation
Two-post flush-mount switch installation
Wall- or ceiling-mount switch installation
One RU ReadyRails installation
Optics installation
Switch start-up
After switch placement
Switch replacement
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, ensure that the following items are included:
One N2200-ON Series switch
One RJ45 to DB-9 female cable
One MicroUSB console cable
One set of rack mounting brackets and screws
Four rubber feet
One pluggable AC PSU (and second AC PSU if ordered)
One or two pluggable DC PSUs (if ordered)
Two or three pluggable fan units, depending on the switch model
One AC power cable, country or region specific
DC only: DC power cables
N2200-ON Series Quick Setup Guide
N2200-ON Series Warnings Guide
Safety and Regulatory Information
Warranty and Support Information
Unpacking Steps
Unpack the system carefully.
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container, or remove the container top.