Setup Guide

12
Installation
Installation
Site Preparation
Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
Clearance
—There is adequate front and rear clearance for operator access.
Allow clearance for cabling, power connections, and ventilation.
Cabling
—The cabling is routed to avoid sources of electrical noise such as
radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature
—The ambient switch operating temperature range
is 10° to 35ºC (50° to 95ºF).
NOTE:
Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above
900 m (2955 ft.).
Relative Humidity
—The operating relative humidity is 8% to 85%
(noncondensing) with a maximum humidity gradation of 10% per hour.
Unpacking the Switch
Package Contents
When unpacking each switch, make sure that the following items are
included:
One N4000 Series switch
One RJ45-to-DB-9 female cable
Two sets of rail kits (no tools required)
Two PSUs (packed separately)
Two AC power cords (country/region specific)
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement