Deployment Guide

19 VCF on VxRail Multirack Deployment using BGP EVPN
4.2 Underlay network connections
Figure 14 shows the wiring configuration for the six switches that include the leaf-spine network. The solid
colored lines are 100 GbE links, and the light blue dashed lines are two QSFP28-DD 200 GbE cable pairs
that are used for the VLT interconnect (VLTi). The use of QSFP28-DD offers a 400 GbE VLTi to handle any
potential traffic increases resulting from failed interconnects to the spine layers. As a rule, it is suggested to
maintain at minimum a 1:1 ratio between available bandwidth to the spine and bandwidth for the VLTi.
Rack 2
Stack ID
Stack ID
Reset
Stack ID
Reset
Stack ID
Stack ID
Stack ID
S5248F-ON
sfo01-leaf01a
S5248F-ON
sfo01-leaf01b
S5248F-ON
sfo01-leaf02a
S5248F-ON
sfo01-leaf02b
Z9264F-ON
sfo01-spine01
Z9264F-ON
sfo01-spine02
Rack 1
Physical switch topology
Note: All switch configuration commands are provided in the file attachments. See Section 1.7 for instructions
on accessing the attachments.