Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4048-ON Installation Guide March 2021
- About this guide
- The S4048–ON switch
- Site preparations
- NEBS compliance
- S4048–ON installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- Network Equipment Building Systems Compliance
- USA Federal Communications Commission Statement
- European Union EMC Directive Conformance Statement
- Japan VCCI Compliance for Class A Equipment
- Korean Certification of Compliance
- Safety Standards and Compliance Agency Certifications
- Electromagnetic Compatibility
- Product recycling and disposal
- Technical Support
Figure 9. Four-post threaded configuration
2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2.
S4048-ON installation
You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a
front-rack configuration:
For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post
configurations.
1U front-rack installation
You must configure the rails that are attached to the switch.
1. Attach the inner chassis members switch rails to the S4048–ON switch.
Item 3 shows the detail for the front standoff with the locking tab.
20
S4048–ON installation