White Papers

Table Of Contents
Conguration
Conguration steps are covered below:
1 Both Gateway VTEPs need VLT congured.
ICL port conguration
interface Port-channel 1
no ip address
channel-member TenGigabitEthernet 0/4-5
no shutdown
VLT Domain Conguration
vlt domain 100
peer-link port-channel 1
back-up destination 10.11.70.14  this is ip address of the peer node
1068
Virtual Link Trunking (VLT)