Setup Guide

Site preparations
The S4112-ON Series (S4112F-ON and S4112T-ON) switch is suitable for installation as part
of a common bond network (CBN).
You can install the switch in:
Network telecommunication facilities
Data centers
Other locations where the National Electric Code (NEC) applies
For more information about the S4112-ON Series switch specications, see Specications.
NOTE: Install the switch into a rack or cabinet before installing any optional
components.
Topics:
Site selection
Cabinet placement
Rack mounting
Switch ground
Fans and airow
Power
Storing components
Site selection
Install your equipment in restricted access areas. A restricted access area is one where
service personnel can only gain access using a special tool, lock, key, or other means of
security. The authority responsible for the location controls access to the restricted area.
Ensure that the area where you install your switch meets the following safety requirements:
Near an adequate power source. Connect the switch to the appropriate branch circuit
protection according to your local electrical codes.