Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support
Figure 6. Four-post threaded installation
2 For each rail, attach the front and back anges to the post anges with two user-supplied screws at each end.
S4100-ON Series system installation
You can mount the system in the 1U front-rack two-post, ush, or center conguration or a four-post conguration. The following is an
example of a front-rack conguration:
For the 1U two-post congurations, slide the system into the rails in the same manner as the four-post congurations.
1U front-rack installation
Congure the rails that are attached to the system.
1
NOTE
: For more information, see the installation instruction labels on the rail.
Attach the inner switch rails to the S4100–ON Series switch.
Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The following
shows the detail of the front stando with the locking tab:
S4100–ON Series installation
15