Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support
![](/manual/dell/powerswitch-s4148u-on/setup-guide-english/images/img-2.png)
Notes, cautions, and warnings
NOTE: A NOTE indicates important information that helps you make better use of your product.
CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem.
WARNING: A WARNING indicates a potential for property damage, personal injury, or death.
Copyright © 2017 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other
trademarks may be trademarks of their respective owners.
2017 - 07
Rev. A00