Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4200-ON Series Set-up Guide
- About this guide
- Site preparations
- S4200-ON Series Installation
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4200-ON Series switch installation
- 1U front-rack installation
- Optics installation
- Switch power-up
- After switch installation
- Specifications
- Support
Figure 4. Two-post flush-mount installation
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
12
S4200-ON Series Installation