Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4200-ON Series Set-up Guide
- About this guide
- Site preparations
- S4200-ON Series Installation
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4200-ON Series switch installation
- 1U front-rack installation
- Optics installation
- Switch power-up
- After switch installation
- Specifications
- Support
Figure 7. Switch rail attachment
2. After you install both rails, line them up on the ReadyRails. Slide the switch in until it is flush with the front of rack.
About three inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently
sliding out and falling.
Figure 8. Front rack installation
S4200-ON Series Installation
15