Install Guide

Figure 12. Two-post center-mount threaded round-hole installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, see items 2 and 3.
3. Repeat this procedure for the second rail.
Four-post threaded installation
NOTE: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly, see item 1.
Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less
latch casting. Retain the castings for future rack requirements.
24
S4200-ON Series installation