Install Guide

Figure 14. Attach switch rail
2. After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush
with front of rack.
To keep the switch from inadvertently sliding out of the rack and falling, about three inches before you fully insert your
switch, the rail locking feature engages.
26
S4200-ON Series installation