Install Guide

Table Of Contents
S5148F-ON switch installation
To install the S5148F-ON switch, complete the installation procedures in the order presented in this section.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S5148F-ON switch and components. As with all electrical devices of this type, take all the necessary
safety precautions to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet hardware installation
ReadyRails installation
Switch installation
Ground cable
Optics installation
Switch power-up
After switch placement
Switch replacement
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, make sure that the following items are included:
One S5148F-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits; no tools required
Two PSUs
Four fan units
Two AC power cords; country or region specific
S5148F-ON Setup Guide
Safety and Regulatory Information
Warranty and Support Information
Unpacking steps
Unpack the switch carefully.
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
5
18 S5148F-ON switch installation