Install Guide

Table Of Contents
Figure 8. Separate rails
Tool-less square-hole installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1. With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange. The following shows how the pegs appear in both the square and
nonthreaded round holes:
20
S5148F-ON switch installation