Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5148F-ON Installation Guide March 2021
- About this guide
- S5148F-ON switch
- Site preparations
- NEBS compliance
- S5148F-ON switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
4. Remove the switch from the rack.
At the same time, press in the two side-release bars on the switch and slide the switch forward.
If you are using the fan trays or PSUs in the replacement switch, remove them from the switch.
5. Unpack the new switch.
For more information, see Unpack.
6. Confirm that the software version of the replacement switch is the same as the previously installed switch.
show os-version
If the software versions do not match, upgrade the replacement switch software using the procedure included with the
firmware download.
7. Copy the backed-up switch configuration to the new switch.
copy tftp://hostip/filepath running-config
8. Install the new switch in your rack or cabinet.
For detailed installation instructions, see S5148F-ON switch installation.
If you are using the fan trays or PSUs from the removed switch, reinsert them in the replacement switch.
9. Connect all the cables.
10. Power on the switch.
For more information, see Switch power up.
28 S5148F-ON switch installation










