Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S5148F-ON Set-up Guide
 - About this guide
 - Site preparations
 - S5148F-ON switch Installation
 - Specifications
 - Support
 
Figure 5. Two-post center-mount installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3. 
3. Repeat this procedure for the second rail.
Four-post threaded installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.
S5148F-ON switch Installation
13










