Setup Guide

S5148F-ON switch Installation
To install the S5148F-ON switch, complete the installation procedures in the order presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet installation
ReadyRails installation
1U Tool-less mount installation
Two-post flush-mount installation
Two-post center-mount installation
Four-post threaded installation
S5148F-ON installation
Optics installation
Switch power-up
After switch installation
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S5148F-ON switch, make sure that the following items are included:
One S5148F-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Four fan units
Two country- and region-specific AC power cords
S5148F-ON Set-up Guide
Safety and Regulatory Information
Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
3
8 S5148F-ON switch Installation