Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5148F-ON Installation Guide July 2021
- Contents
- About this guide
- S5148F-ON switch
- Site preparations
- NEBS compliance
- S5148F-ON switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
Figure 5. GND lug assembly
1. Remove the two installed M3 screws from the lower-left side of your switch.
NOTE: Keep these screws.
2. Remove the bracket assembly from the shipping bag.
3. Clean the bracket and lug surfaces thoroughly and apply an anti-oxidant solution to the mating surfaces.
4. Attach the switch ground using the Ground cable instructions.
5. Using the two removed screws, attach the GND lug bracket assembly to your switch, as shown.
Torque the M3 screws to ±4-5 in-lbs.
Figure 6. Attach the GND lug assembly
16
NEBS compliance










