Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5148F-ON Installation Guide July 2021
- Contents
- About this guide
- S5148F-ON switch
- Site preparations
- NEBS compliance
- S5148F-ON switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
Figure 10. Two-post flush-mount configuration
2. Attach one rail to the front post flange with two user-supplied screws. See item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws. See item 3.
4. Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws. See item 1.
S5148F-ON switch installation
21










