Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5148F-ON Installation Guide July 2021
- Contents
- About this guide
- S5148F-ON switch
- Site preparations
- NEBS compliance
- S5148F-ON switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
Figure 13. Attach switch rail
2. After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush
with front of rack. To keep the switch from inadvertently sliding out of the rack and falling, about 3 inches before you fully
insert your switch, the rail locking feature engages.
Figure 14. Front rack installation
24
S5148F-ON switch installation










