Install Guide
Table Of Contents
- S5148F-ON Installation Guide January 2019
- About this guide
- S5148F-ON switch
- Site preparations
- NEBS compliance
- S5148F-ON switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support

Figure 9. 1U tool-less nonthreaded square hole installation
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
NOTE: Be sure that the rails click into place and are secure.
3 Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each ange ear and unseat each rail.
Two-post ush-mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1 For this conguration, remove the castings from the front side of each ReadyRails assembly, see item 1. Use a Torx screwdriver to
remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for
future rack requirements. Do not remove the back latch castings.
S5148F-ON switch installation
23










