Setup Guide

S5148F-ON switch Installation
To install the S5148F-ON switch, complete the installation procedures in the order presented
in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet installation
ReadyRails installation
1U Tool-less mount installation
Two-post ush-mount installation
Two-post center-mount installation
Four-post threaded installation
S5148F-ON installation
Optics installation
Switch power-up
After switch installation
Unpack
NOTE
: Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
3
S5148F-ON switch Installation 11