Setup Guide

When unpacking the S5148F-ON switch, make sure that the following items are included:
One S5148F-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Four fan units
Two country- and region-specic AC power cords
S5148F-ON Set-up Guide
Safety and Regulatory Information
Warranty and Support Information
1 Place the container on a clean, at surface and cut all straps securing the container.
2 Open the container or remove the container top.
3 Carefully remove the switch from the container and place it on a secure and clean
surface.
4 Remove all packing material.
5 Inspect the product and accessories for damage.
Rack or cabinet installation
You may either place the switch on a rack shelf or mount the switch directly into a 19" wide,
EIA-310- E-compliant rack. Rack mounting includes four-post, two-post, round threaded
holes, or square holes. The ReadyRails system is provided for 1U front-rack and two-post
installations.
The ReadyRails system includes two separately packaged rail assemblies. To begin
installation, separate each rail assembly by sliding the inside rail out of the outside rail.
WARNING
: This guide is a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory
information booklet before you begin.
NOTE: The illustrations in this section are not intended to represent a specic
switch.
NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace.
12 S5148F-ON switch Installation