Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5200F-ON Series Installation Guide January 2021
- About this guide
- S5200F-ON Series switch
- Site preparations
- S5200F-ON Series switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
2. Insert the second switch in the open dual-tray slot if you are installing two switches.
The switch is fully inserted when it presses the stop features on the dual tray. The front switch latch snaps the switch into
place.
Close-up view of the stop at the back of the switch.
One-half U switch removal
Remove the S5212F-ON switch using the following instructions:
NOTE:
To remove the S5232F-ON, S5248F-ON, S5296F-ON, or S5224F-ON switch, see One U ReadyRails installation. To
remove the S5296F-ON switch, see Two U four-post rack assembly.
Push in the front switch latches according to the latch arrows and pull out the switch.
One U ReadyRails installation
S5224F-ON, S5248F-ON, and S5232F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole
method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount,
two-post center mount, or four-post threaded mount.
S5200F-ON Series switch installation
31