Install Guide
Table Of Contents
- Dell EMC PowerSwitch S5200F-ON Series Installation Guide January 2021
- About this guide
- S5200F-ON Series switch
- Site preparations
- S5200F-ON Series switch installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Agency compliance
- USA Federal Communications Commission statement
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Safety standards and compliance agency certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support
2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.
Switch installation
For the 1U two-post configurations for the S5224F-ON, S5248F-ON, and S5232F-ON switches, slide the switch into the rails in
the same manner as the four-post configurations.
For the S5212F-ON switch installation, see One-half U front-rack installation. For the S5296F-ON switch installation, see Two U
four-post rack assembly.
1U front-rack installation
Configure the rails that are attached to the switch.
NOTE: For more instructions, see the installation instruction labels on the rail.
1. Attach the inner switch rails to the S5200F-ON Series switch.
Line up the rail with the mounting heads and attach the rail to the switch.
Slide the rail back until it locks into place. The following shows the detail of the front standoff with the locking tab:
36
S5200F-ON Series switch installation