Figure 8. Dual-tray stop feature
2. Insert the second switch in the open dual-tray slot if you are installing two switches.
One-half U switch removal
Remove the S5212F-ON switch from the dual tray from the front of the four-post rack.
NOTE: To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One U ReadyRails installation. To remove the
S5296F-ON switch, see Two U four-post rack assembly.
Push in the front switch latches according to the latch arrows and pull out the switch.
Figure 9. Switch release latches
Figure 10. Switch release arrow
One U ReadyRails installation
For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole
method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post
center mount, or four-post threaded mount.
NOTE:
To install the S5212F-ON switch, see One-half U front-rack installation. To install the S5296F-ON switch, see
Two U four-post rack assembly.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
12